Permit guidance · Last reviewed 2026-08-28

AC Replacement Permits in Miami

A permit is generally required until the building department with jurisdiction says otherwise. This is educational information, not a legal determination and not a substitute for the building department.

City of Miami vs unincorporated Miami-Dade

City of Miami

The City of Miami Building Department treats central air-conditioning replacement as permitted mechanical work. Homeowners can start from the City's residential permit guide (A/C unit items) and iBuild. Confirm current checklists with the City — this page does not issue permits.

Miami-Dade County (unincorporated)

Unincorporated Miami-Dade (RER / Building) lists mechanical change-out work in its fee and permit materials, including residential hardening / exact change-out categories when they apply. If your property is inside a municipality, that city — not the County unincorporated process — is usually the authority.

Other municipalities (Coral Gables, Miami Beach, Hialeah, and the rest) have their own building departments. Always start with the jurisdiction of the property address.

Typical steps

  1. Identify whether your address is in the City of Miami, unincorporated Miami-Dade, or another municipality.
  2. Ask the licensed mechanical contractor whether they will pull the permit under their license.
  3. Expect equipment specifications, and for many replacements, inspection after install.
  4. Do not energize flood-damaged equipment until a qualified contractor says it is safe.

Exemptions (high level)

Portable plug-in cooling units are generally not the same job as replacing a central system. Exact exemption language belongs to the building department with jurisdiction.

Fees

Fees are published in municipal and County fee schedules and change. We do not reprint dollar amounts here. Ask the contractor whether the permit fee is included in the quote, then confirm the current schedule with the department that will issue the permit.

Official resources

Businesses that perform related work

Directory classifications from source evidence — not a certified permit-puller list.

Sources & verification

Factual and regulatory statements on this page are based on official government and licensing authorities. Requirements change — always confirm current details at the source.

Questions

Can you tell me if I need a permit?

Only the building department with jurisdiction over the address can. This page summarizes published City of Miami and Miami-Dade guidance and links to those sources.

Who should pull the permit?

For licensed contracting work, the contractor typically pulls it under their license. Being asked to pull it yourself as an owner-builder shifts responsibility to you.