A permit is generally required until the building department with jurisdiction says otherwise. This is educational information, not a legal determination and not a substitute for the building department.
City of Miami vs unincorporated Miami-Dade
City of Miami
MEP repair permits appear on City walk-thru lists. New circuits, panel changes, and service upgrades are not 'a fixture swap.'
Miami-Dade County (unincorporated)
New circuits, panel replacements, and service work are generally permitted and inspected. Utility (FPL) coordination is extra for meter/service work.
Other municipalities (Coral Gables, Miami Beach, Hialeah, and the rest) have their own building departments. Always start with the jurisdiction of the property address.
Typical steps
- Match the electrician's license class to the work.
- Ask who pulls the permit and who coordinates with FPL if needed.
- Do not skip inspection on panel or service work.
Exemptions (high level)
Replacing a like device or fixture is more often exempt than adding a circuit. The department decides.
Fees
Electrical permit fees are in local schedules. Confirm before comparing contractor quotes that omit them.
Official resources
Businesses that perform related work
Directory classifications from source evidence — not a certified permit-puller list.
Sources & verification
Factual and regulatory statements on this page are based on official government and licensing authorities. Requirements change — always confirm current details at the source.
- Florida Department of Business and Professional Regulation (DBPR) — Verify a License / Licensee SearchVerification of Florida construction, real-estate, CPA, cosmetology, and other DBPR-regulated licenses.Source checked 2026-08-28
- Miami-Dade County — Contractor licensing and permitting (RER / Building)Miami-Dade County contractor licensing and building permit requirements.Source checked 2026-08-28
- Florida Building Commission — Florida Building CodeThe Florida Building Code and the High Velocity Hurricane Zone (HVHZ) that applies to Miami-Dade.Source checked 2026-08-28
- City of Miami Building Department — Permits, construction, and residential permit guideCity of Miami building permits, iBuild, express review, and roofing/window/solar catalog items. Confirm current checklists on the City site.Source checked 2026-08-28
Questions
Can you tell me if I need a permit?
Only the building department with jurisdiction over the address can. This page summarizes published City of Miami and Miami-Dade guidance and links to those sources.
Who should pull the permit?
For licensed contracting work, the contractor typically pulls it under their license. Being asked to pull it yourself as an owner-builder shifts responsibility to you.